09-30-22
The apparatus completed final assembly and was released to test, quality and graphics. It is now being made ready for final inspection.
09-23-22
There is no update on this unit this week due to the truck being unavailable for photos.
08-26-22
The cab and pump house were installed on the frame while the body completed initial assembly.
08-19-22
The cab continued initial assembly, the frame build continued, the pump house started final assembly, and the body started in paint.
08-12-22
The cab continued initial assembly, the frame build continued, the pump house started initial assembly, and the body continued fabrication.
08-05-22
The cab started initial assembly, frame build continued, and body began fabrication.
07-15-22
The cab has completed fabrication and began the paint process. In the next report, the cab may continue paint.