02-24-23
The apparatus concluded final assembly and testing. It was then released to quality and graphics where any remaining content will be applied. Once complete, it will be made ready for the final inspection. This is the last scheduled report.
01-06-23
The unit being prepared for body installation and the body has started initial assembly.
12-16-22
The cab continued initial assembly and was staged, the frame build continued, and the body continued the paint process.
12-09-22
The cab continued initial assembly, the frame build continued, and the body continued the paint process.
12-02-22
The cab completed paint and began initial assembly, the frame build began, and the body completed fabrication and began the paint process.
11-11-22
The cab remained staged to continue the paint process while the body began fabrication.