08-04-23
In this report, the apparatus continued the quality process. Once complete, it will be made ready for your final inspection. This is the last scheduled report.
07-28-23
In this report, the apparatus completed test and released to quality and graphics where any remaining content will be installed.
06-23-23
There will be no report this week due to no progress since the last report on the unit.
05-26-23
In this report the chassis continued assembly while the body began initial assembly
05-19-23
There will be no report this week due to no progress since the last report on this unit.
05-12-23
In this report your chassis was staged to continue assembly, and the body was staged to begin initial assembly.
05-05-23
The cab and pump house were installed on the frame, and the body was unavailable for photos.
04-28-23
The cab continued initial assembly, the frame build continued, the pump remained staged, and the body made progress through paint and was staged.
04-21-23
The cab continued initial assembly, the frame build continued, the pump remained staged, and the body continued the paint process.