04-28-23
THE apparatus completed final assembly and was released to test. Once testing completes, it will release to quality and graphics where any remaining content will be applied. It will then be made ready for your final inspection. This is the last scheduled report.
04-07-23
The cab, pump house and body were installed on the frame while assembly continued.
03-31-23
The cab was staged to be installed, the frame build continued, and the pump house and body remained staged.
03-24-23
The cab continued initial assembly, the frame build continued, the pump house is staged, and the body is staged for initial assembly.
03-17-23
The cab continued initial assembly, the frame build continued, the pump house was painted, and the body completed continued through paint.
03-10-23
The cab began initial assembly, the frame build continued, the pump house began initial assembly, and the body completed fabrication and began the paint process.
03-03-23
The cab made progress through paint and was staged, the frame build continued, and the body continued fabrication.
02-21-23
The cab continued through paint, the frame build began, and the body began fabrication.
01-27-23
This Pierce apparatus is now in production. In this report, the cab began fabrication.