37812 – Pompton Lakes – Arrow XT 100′ Ascendant Aerial

Arrow XT 100' Ascendant Aerial
Job #: 37812

PROGRESS UPDATES


08-11-23

In this report the aerial device was pinned to the apparatus followed by the completion of testing and the release to the quality process. Once finished, the apparatus will release to graphics where any remaining content will be applied. It will then be made ready for your final inspection. This is the last scheduled report.


08-04-23

In this report, the apparatus completed final assembly and was staged while the aerial device continued assembly.


08-04-23

In this report the apparatus completed final assembly and was staged while the aerial device continued assembly.


07-21-23

In this report the torque box and body modules were merged with the chassis followed by the start of final assembly, while the aerial device was staged.


07-14-23

This week, the cab and pump house were installed on the frame, your torque box began assembly, the front body module was staged, and the rear body module began initial assembly .


06-30-23

In this report the cab continued initial assembly, the frame build continued, the pump house and forward body module remained staged, and the rear body module made progress through paint and was staged


06-23-23

The cab began initial assembly, the frame build continued, the pump house and forward body module remained staged, and the rear body module was staged to continue the paint process.


06-16-23

The cab made progress through paint and was staged, the pump house remained staged, the forward body module completed initial assembly, and the rear body module continued through paint


06-09-23

The cab continued the paint process, the pump house remained staged, the forward body module completed paint and was staged, and the rear body module began the paint process.


06-02-23

In this report the cab continued through paint, the pump house remained staged, the front body module was unavailable for photos, and the rear body module remained staged.


05-26-23

In this report the cab began the paint process, the pump house remained staged, the front body module began the paint process, and the rear body module was staged.


05-19-23

In this report, the cab completed fabrication and was staged, the pump house completed initial assembly and was staged, the front body module began fabrication, and the rear body module completed fabrication.


05-12-23

This new Pierce apparatus is now in production. In this report the cab and rear body module began fabrication.