03-08-24
In this report, the apparatus continued the quality process.
Once finished, it will be made ready for customer
acceptance inspection. This is the last scheduled report.
03-01-24
In this report, the apparatus completed testing and released to quality and graphics.
02-23-24
In this report, the apparatus completed final assembly followed by release to test.
02-02-24
In this report, the pump house and body were installed on the chassis, initial assembly was completed, and the apparatus was staged.
01-26-24
In this report, the cab was installed on the frame while the pump house and body remained staged.
01-19-24
In this report, the cab remained staged, the frame build began, and the pump house and body remained staged.
01-12-24
In this report, the cab was staged to continue initial assembly while the pump house remained staged, and the body completed initial assembly.
01-05-24
In this report, the cab continued initial assembly, the pump house was staged, and the body remained staged.
12-22-23
In this report, the cab began initial assembly, the pump house continued initial assembly, and the body continued through paint.
12-15-23
In this report, the cab completed paint, the pump house continued initial assembly, and the body continued the paint process.
12-08-23
In this report, the cab continued through paint, the pump house began initial assembly, and the body began the paint process.
12-01-23
In this report, your cab began the paint process, the pump house structure remained staged, and the body began the paint process.
11-17-23
In this report, the cab completed fabrication while the pump house structure was fabricated and staged.