38052 – Morristown – Enforcer 107′ Ascendant Tiller

Enforcer 107' Ascendant Tiller
Job #: 38052

PROGRESS UPDATES


02-09-24

In this report, the apparatus was staged to continue testing.


02-02-24

In this report, the aerial device was pinned to the apparatus followed by the start of aerial testing.


01-26-24

In this report, the apparatus continued assembly while the aerial device continued initial assembly.


01-19-24

In this report, the tiller cab completed initial assembly and was installed on the apparatus while the aerial device arrived and began initial assembly.


01-12-24

In this report, the transverse compartment and the body modules were installed on the apparatus followed by the start of final assembly, while the tiller cab continued initial assembly.


01-05-24

In this report, the tractor chassis continued assembly along with the trailer frame, the transverse compartment remained staged, the body modules continued initial assembly, and the tiller cab began initial assembly.


12-22-23

In this report, the chassis was staged to continue assembly, the transverse compartment was staged, the body modules began initial assembly, and the tiller cab remained staged.


12-15-23

In this report, the tractor cab was installed on the frame, the transverse compartment began the paint process, the forward body modules continued the paint process, the rear body module completed paint, and the tiller cab remained staged.


12-08-23

In this report, the tractor cab began initial assembly, the frame build continued, the transverse compartment began fabrication, the forward body modules continued the paint process, the rear body module began in paint, and the tiller cab remained staged.


12-01-23

In this report, the tractor cab completed paint, the frame build continued, one forward body module began the paint process while the other continued fabrication, the rear body module continued fabrication, and the tiller cab completed paint and was staged.


11-17-23

In this report, the tractor cab continued the paint process, the frame build continued, the forward body modules continued fabrication, the rear body module began fabrication, and the tiller cab was unavailable for photos.


11-10-23

In this report, the tractor cab continued through paint, the frame build began, the forward body modules continued fabrication, and the tiller cab began the paint process.


11-03-23

In this report, the tractor began the paint process, one of the front body modules began fabrication, and the tiller cab was staged.


10-27-23

In this report, the tractor cab completed fabrication and was staged while the tiller cab was fabricated.