07-12-24
In this report, the apparatus completed final assembly and testing followed by release to quality and graphics where any remaining content will be applied.
06-14-24
In this report, the cab and pump house were installed on the frame while the body completed paint and initial assembly.
06-07-24
In this report, the cab remained staged, the frame build continued, the pump house was painted and continued initial assembly, and the body continued through paint.
05-31-24
In this report, the cab completed initial assembly and was staged, the frame build continued, the pump house continued initial assembly, and the body began the paint process.
05-24-24
In this report, the cab began initial assembly, the frame build continued, the pump house began initial assembly, and the body remained staged.
05-17-24
In this report, the cab completed paint, the frame build began, the pump house structure remained staged, and the body completed fabrication.
05-10-24
In this report, the cab completed fabrication and began the paint process while the pump house structure was fabricated and staged.
05-03-24
This new Pierce apparatus is now in production! In this report, the cab began fabrication.