38550 – Burlington City – Enforcer Pumper

Enforcer Pumper
Job #: 38550

PROGRESS UPDATES


08-25-23

In this report, the apparatus completed final assembly and began the quality process.


08-11-23

In this report the body was merged with the chassis while initial assembly continued.


08-11-23

In this report the body was merged with the chassis while assembly continued.


08-04-23

In this report the cab and pumphouse were installed on the frame while the body remained staged.


07-28-23

In this report the cab remained staged, the frame build
began, the pump house remained staged, and the body completed initial assembly.


07-21-23

In this report the cab and pump house remained staged while the body began initial assembly.


07-14-23

This week, the cab and pump house remained staged while the body completed paint and was staged.


06-30-23

In this report, the cab continued initial assembly, the pump house remained staged, and the body continued the paint process.


06-23-23

The cab began initial assembly, the pump house completed initial assembly and was staged, and the body continued through paint.


06-16-23

The cab made progress through paint and was staged, the pump house continued initial assembly, and the body began the paint process.


06-09-23

The cab continued through paint, the pump house continued initial assembly, and the body released to paint.


06-02-23

In this report the cab continued the paint process, the pump house began initial assembly, and the body completed fabrication and was staged.


05-26-23

In this report the cab continued through paint while the body began fabrication