38557 – Neptune

Enforcer Pumper
Job #: 38557

PROGRESS UPDATES


08-23-24

In this report, the cab completed paint and was staged, the frame build began, the pump house began initial assembly and was painted, and the body completed fabrication.


08-16-24

In this report, the cab continued through paint, the pump house structure remained staged, and the body began fabrication.


08-09-24

In this report, the cab completed fabrication and began the pant process while the pump house structure remained staged.


08-02-24

This new Pierce apparatus is now in production! In this report, the cab began fabrication while the pump house structure was fabricated and staged.