10-04-24
In this report, the apparatus completed testing and was released to quality and graphics where any remaining content will be applied. Once finished it will be made ready for the customer acceptance inspection. This is the last scheduled report.
09-13-24
In this report, the body completed initial assembly and was merged with the chassis followed by the start of final assembly.
09-06-24
In this report, the chassis continued assembly while the body completed the paint process and began initial assembly.
08-31-24
In this report, the cab began initial assembly, the frame build continued, and the pump house continued initial assembly followed by the cab and pump house being installed on the frame while the body began the paint process.
08-23-24
In this report, the cab completed paint and was staged, the frame build began, the pump house began initial assembly and was painted, and the body completed fabrication.
08-16-24
In this report, the cab continued through paint, the pump house structure remained staged, and the body began fabrication.
08-09-24
In this report, the cab completed fabrication and began the pant process while the pump house structure remained staged.
08-02-24
This new Pierce apparatus is now in production! In this report, the cab began fabrication while the pump house structure was fabricated and staged.