06-09-23
The apparatus completed testing and released to quality and graphics where any remaining content will be applied. Once finished, it will be made ready for final inspection.
05-26-23
In this report the aerial device was pinned to the apparatus followed by the start of aerial testing.
05-19-23
In this report, the apparatus completed final assembly and was staged while the aerial device began initial assembly.
05-12-23
In this report final assembly continued. In the next report the apparatus may continue final assembly.
05-05-23
The body modules completed initial assembly and were merged with the chassis, followed by the start of final assembly.
04-28-23
The torque box was being installed on the chassis, and the front body and rear body modules started initial assembly.
04-21-23
The cab completed initial assembly and was installed, with the pump house, on the frame, the front body module completed paint and was staged, and the rear body module remained staged.
04-14-23
The cab continued initial assembly, the frame build began, the pump house remained staged, the front body module was unavailable for photos, and the rear body module made progress through paint and was staged.
04-07-23
The cab began initial assembly, the pump house completed initial assembly, the front body module remained unavailable for photos, and the rear body module continued through paint.
03-31-23
The cab completed the paint process and was staged for initial assembly, the pump house started initial assembly, the front body module was unavailable for photos, and the rear body module started the paint process.
03-24-23
The cab made progress through paint and was staged, the front body module was fabricated and released to paint, and the rear body module remained staged
03-17-23
The cab continued through paint while the
rear body module completed fabrication and was staged.