03-21-25

In this report, the torque box was merged with the chassis, the turntable module began initial assembly, and the rear body module was being installed on the chassis.


03-14-25

In this report, the cab and pump house were installed on the frame, the torque box continued initial assembly, the front body module completed paint, and the rear body module began initial assembly.


03-07-25

In this report, the cab continued initial assembly, the frame build continued, the pump house completed initial assembly, the torque box began initial assembly, the front body module was unavailable, and the rear body began the paint process.


02-28-25

In this report, the cab began initial assembly, the frame build continued, the pump house was painted, the torque box arrived and was staged, the front body module began fabrication, and the rear body completed fabrication.


02-21-25

In this report, the cab completed paint, the frame build began, and the rear body began fabrication.


02-14-25

In this report, the cab began the paint process.


02-07-25

In this report, the cab completed fabrication.


01-31-25

This new Pierce apparatus is now in production! In this report, the cab began fabrication.