08-16-24
In this report, the apparatus continued the quality and graphics process where any remaining content is applied. Once finished, it will be made ready for the customer acceptance inspection. This is the last scheduled report.
08-09-24
In this report, the apparatus completed testing followed by release to quality and graphics where any remining content will be applied.
08-02-24
In this report, the apparatus completed final assembly
and released to initial test.
07-26-24
In this report, the apparatus completed initial assembly and began final assembly.
07-19-24
In this report, the pump house was installed on the chassis followed by the body completing paint and initial assembly then being merged with the chassis.
07-12-24
In this report, the cab completed initial assembly and was installed on the frame, the pump house completed initial assembly and was staged, and the body began the paint process.
06-28-24
In this report, the cab completed paint and was staged, the frame build continued, the pump house continued initial assembly, and the body remained staged.
06-21-24
In this report, the cab continued through paint, the frame build continued, the pump house was painted, and the body completed fabrication and was staged.
06-14-24
In this report, the cab completed fabrication and began the paint process, the frame build began, the pump house began initial assembly, and the body began fabrication.
06-07-24
This new Pierce apparatus is now in production! In this report, the cab began fabrication.