PROGRESS UPDATES


04-04-25

In this report, the cab and pump house completed initial assembly and were merged with the frame while the body began initial assembly.


03-28-25

In this report, the cab continued initial assembly, the frame build continued, the pump house was painted, and the body completed fabrication and paint.


03-21-25

In this report, the cab completed paint and began initial assembly, the frame build began, the pump house continued initial assembly, and the body continued fabrication.


03-14-25

In this report, the cab began the paint process, the pump house began initial assembly, and the body began fabrication.


03-07-25

In this report, the cab completed fabrication and was staged while the pump house structure was fabricated.


02-28-25

In this report, the cab continued the fabrication process.


02-21-25

This new Pierce apparatus is now in production! In this report, the cab began fabrication.