11-15-24
In this report, the apparatus completed final assembly and test followed by release to quality and graphics where any remaining content will be applied.
11-01-24
In this report, the cab and pump house completed initial assembly and were installed on the frame followed by the body completing paint and initial assembly then merged with the chassis while initial apparatus assembly continued.
10-25-24
In this report, the cab continued initial assembly, the frame build continued, the pump house was painted, and the body completed fabrication and began the paint process.
10-18-24
In this report, the cab completed paint and began initial assembly, the frame build continued, the pump house began initial assembly, and the body began fabrication.
09-27-24
This new Pierce apparatus is now in production! In this report, the cab was fabricated and staged.