39186 – Wall Twp. 2/Glendola Fire Co.

Enforcer Pumper
Job #: 39186

PROGRESS UPDATES


03-14-25

In this report, the body completed initial assembly and was merged with the chassis followed by the start of final assembly.


03-07-25

In this report, the chassis continued assembly while the body completed paint and began initial assembly.


02-28-25

In this report, the cab began initial assembly, the frame build began, and the pump house continued initial assembly–followed by the cab and pump house completing initial assembly then being installed on the frame while the body began the paint process.


02-21-25

In this report, the cab completed the paint process, the pump house continued initial assembly, and the body remained staged.


02-14-25

In this report, the cab began the paint process, the pump house began initial assembly, and the body was fabricated and staged.


02-07-25

In this report, the cab remained staged to begin in paint while the pump house structure began fabrication.


01-17-25

In this report, the cab completed fabrication.


01-24-25

In this report, the cab was staged to begin in paint.


01-10-25

Congratulations! This new Pierce apparatus is now in production! In this report, the cab began fabrication.