04-11-25
In this report, the cab, pump house and body were merged with the frame followed by the start of final assembly.
04-04-25
In this report, the cab began initial assembly, the frame build began, the pump house completed initial assembly, and the body completed remained staged.
03-28-25
In this report, the cab completed paint, the pump house was painted, and the body completed paint and was staged.
03-21-25
In this report, the cab continued through paint, the pump house began initial assembly, and the body completed fabrication and began the paint process.
03-14-25
In this report, the cab began the paint process in metal finishing, the pump house structure remains staged, and the body began fabrication.
03-07-25
In this report, the cab remained staged while the pump house structure was fabricated.
02-14-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.