11-29-24

In this report, the apparatus was staged for final product evaluation where any remaining content will be applied. Once finished it will be made ready for the customer acceptance
inspection. This is the last scheduled report.


11-22-24

In this report your apparatus completed testing and was staged. In the next report your apparatus may begin final product evaluation where any remaining content will be applied.


11-08-24

In this report, the apparatus began final assembly.


11-01-24

In this report, the pump house, tank, and body were merged with the chassis.


10-11-24

In this report, the cab continued initial assembly, the frame build continued, the pump house remained staged (no photos), and the body completed initial assembly.


10-04-24

In this report, the cab began initial assembly, the frame build continued (no photos), the pump house completed initial testing and was staged, and the body began initial assembly.


09-27-24

In this report, the cab completed paint and was staged, the frame was staged to continue assembly (no photos), the pump house completed initial assembly and was staged, and the body remained staged (no photos).


09-20-24

In this report, the cab continued through paint, the frame was staged to continue assembly (no photos), the pump house began initial assembly, and the body remained staged to begin initial assembly.


09-13-24

In this report, the cab began the paint process, the frame build continued (no photos), the pump house was painted and staged, and the body completed paint.


09-06-24

In this report, the cab completed fabrication and was staged, the frame was staged to continue assembly, the pump house continued initial assembly, and the body completed fabrication and began the paint process.