01-19-24
In this report, the apparatus was released for initial and third-party pump testing. the truck began final product evaluation, and any remaining content will be installed prior to release and customer acceptance. This will be the last report.
12-15-23
In this report, the cab was in staging and the chassis frame began initial assembly. The pump house and body were in staging.
12-08-23
In this report, the cab began to receive trim and wiring harnesses, and the pump house is in staging. The body finished with paint.
12-01-23
In this report, the cab finished the paint process, and the body was unavailable for photos.
11-18-23
This new Pierce apparatus is now in production at the Bradenton Florida facility. In this report, the body began fabrication.