03-21-25
In this report, the cab began initial assembly, the frame build continued, the pump house continued initial assembly, and the body completed paint and was staged.
03-14-25
In this report, the cab completed paint and was staged, the frame build continued, the pump house remained unavailable for photos, and the body began the paint process.
03-07-25
In this report, the cab continued through paint, the frame build began, the pump house was unavailable for photos, and the body completed fabrication.
02-28-25
In this report, the cab began the paint process while the pump house began initial assembly, and the body began fabrication.
02-21-25
In this report, the cab remained staged to begin the paint process while the pump house structure was fabricated.
01-24-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.